Choir Yard Workshops |
|
Ely Cathedral |
|
£85,000 |
|
16 weeks |
|
Built within the confines of the Old Choir Yard
these facilities provide much needed workshop and
storage space.
The objective of the build was to provide the required
space which was to be sympathetic to the surroundings
of the existing Cathedral. |
|
In order to preserve the antiquities possibly
present the floor slab was cast with the minimum
of disturbance to the existing ground.
Reclaimed materials were used wherever possible
and the superstructure was a timber frame with
tongue and groove panel boarding.
The client was delighted with the end result and
was particularly impressed with the minimal disruption
to this extremely sensitive environment. |